After due planning on drilling, and running the Pitot Static lines – the routing of teflon lines is complete and it is connected to GRT EFIS as well
Wiring cleaned up
All drops are secured from loose rattling.
After due planning on drilling, and running the Pitot Static lines – the routing of teflon lines is complete and it is connected to GRT EFIS as well
Wiring cleaned up
All drops are secured from loose rattling.